What to specify
Participant numbers, date and hours; venue and seating; sound, screen, microphones and technical support; programme, speakers or moderator and supplier duties; catering, accessibility and participant materials; outputs, documentation, acceptance and correction deadlines.
Scope first, then details
Start with the subject and objective, then scale, dates, responsibilities and outputs. Requirements should be understandable, priceable and verifiable.
Prepare a draft
Enter your requirements and review the free preview. The generator supports drafting and further editing; it does not replace the contracting organisation’s checks or legal analysis.
Educational material and examples to adapt to your procurement. This is not individual legal advice or a complete template for every procedure. The generator organises your entries; it does not verify their accuracy or legal compliance. Review and complete the draft before use.
Outline to complete for your procurement
Use these fields to prepare your requirements. The complete Word example also covers accessibility, supplier responsibilities, rights, acceptance and payment.
| Area | What to define |
|---|---|
| Event and audience | Objective, participants, date, registration times and programme. |
| Venue and accessibility | Seating, capacity, entry, facilities and audience needs. |
| Technical support | Microphones, display, sound, rehearsal and support during the event. |
| Moderator and speakers | Who provides personnel, preparation and event duties. |
| Catering and materials | Portions, serving occasions, participant materials and handover dates. |
| Acceptance and documentation | Checks before, during and after the event. |
Practical check
For 100 participants, check room capacity in the selected seating layout, rather than the venue’s overall maximum. Include technical setup, registration, sessions and breaks. State who approves programme changes and how faults are reported.
Can I use this example as my final specification?
Adapt it to your procurement and review the scope, dates, acceptance and contract. It is a drafting aid, not a legal compliance check. Your own entries are included as entered and are not automatically translated.